Clean energy shouldn't require dirty batteries. Discover mechanical energy storage built to last 30 years with zero degradation and no rare-earth minerals.

22,000 rated cycles with zero capacity loss. Watch the 2-minute intro, then unlock the full founder webinar.

$110M in signed LOIs · SOSV backed · EPRI validated · Made in the USA
The Qnetic flywheel rotor

2-minute intro from the founders.

Free. No obligation. Instant access to the full briefing.

In the webinar

What the founders cover.

Part one

The lithium problem

Mined in Chile, shipped through China, flammable on the grid. The CEO opens with why today's storage is a contradiction.

Part two

The machine

From the proven Vega prototype to the Q1 commercial unit: the rotor, the vacuum, and the physics of zero degradation.

Part three

The traction

How a 14-person company signed $110M in letters of intent, and the SMUD and national-lab pilots that come next.

Part four

The investor Q&A

Unscripted answers on earthquakes, competitors, technical risk, and what a 30-year lifespan really means.

Letters of intent are non-binding. The webinar closes with where to find the offering documents.

Why it wins

A battery that outlasts lithium.

Qnetic Q1 flywheel storage unit

Stores energy efficiently, delivering clean power on demand.

No capacity loss, working like new for 30 years.

Handles any environment, from desert heat to Arctic cold.

Free of scarce supply chains, made from abundant, locally sourced materials.

Completely safe, with no fire risk or toxic chemicals.